top of page
Metro
At an underground Metro project
Barrette diagram walls: the walls are 1.5 meters thick, yet water intrusion still happened. The main solution was a system of drainage + sump pump + cover walls.
Tunnels constructed by TBM (tunnel boring machine) technology: Inject foam sealant at leaky spots.
bottom of page